DOCUMENTATION OF ACTION

Many companies and institutions we already trusted, many projects are already behind us. Selected opinions presented below.

Polskie Koleje Państwowe S.A.

Energy audit of company.

Download

InnoEnergy KIC

Participation in consortium carrying out of research and implementation work within the project: POLYGEN – Municipal polygeneration system fired with biomass and waste, financed by InnoEnergy.

Download

Polska Grupa Górnicza S.A.

Energy audit of company.

Download

PGE S.A.

Execution of independent expertises for certification of the main auction of the “Capacity Market” for years 2021-2023 for 50 Capacity Market Units.

Download

RAFAKO S.A.

Execution of calculation-consulting service of energy unit concept with emission level under 550 kg CO2/MWh.

Download

Jastrzębska Spółka Węglowa S.A.

Energy audit of company.

Download

EC Skierniewice

Elaboration of feasibility study of project concerning the reducing emission and the preparation and submission of application in the E-kumulator program financing by NFOŚiGW (National fund for environmental protection and water management).

Download

Operator Logistyczny Paliw Płynnych Sp. z o.o.

Energy audit of company with energy efficiency audits of selected upgrades.

Download

Gdańskie Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o.

Analysis and technical-economic evaluation of the developed solution ensuring heat supply in conditions of the planned development of the municipal heating network in years 2016-2021.

Download

PGNiG Termika Energetyka Przemysłowa S.A.

Execution of expertise for generating unit for certification of main auction of the “Power Market” for years 2021-2023.

Download

NGK Ceramics Polska Sp. z o.o.

Summary of consulting, computing and implementation services for NGK Ceramics Polska Sp. z o.o. in the years 2015 – 2018.

Download

MPWiK w Lublinie Sp. z o.o.

Energy audit of company.

Download

ZEC S.A. w Katowicach

Technical-economic concept of gas dehydration installation from methane drainage mines.

Download

PGE GiEK S.A.

Consulting services connected to preparation of the application, submitted in the framework of the sectoral Program “PBSE” for the project: “Installation of ashes vitrification in hybrid boiler furnace”.

Download

MPEC Włocławek Sp. z o.o.

Elaboration of the feasibility study and financial model for investment of adaptation the existing heat source to requirements of the IED Directive – second stage.

Download

RAFAKO S.A.

Consulting services connected to preparation of the application for co-financing the project: “HYBRID system of limiting emission of acidic components and fly ash from flue gas (HYBRID +)”.

Download

MPWiK S.A. we Wrocławiu

Energy audit of company.

Download

PGE GiEK S.A. o. El Turów

Technical-economic evaluation of the expansion of heating network.

Download

Grupa Azoty S.A.

Consulting services in the process of performing Pre-FEED evaluation of production system of chemical substances based on gasification of coal with capacity exceeding 400 MW chemical fuel energy.

Download

RAFAKO S.A.

Elaboration of concept with determination of technical and economic parameters for hybrid power unit.

Download

MESKO S.A. Polska Grupa Zbrojeniowa

Energy audit of company.

Download

Tauron Wytwarzanie S.A.

Elaboration of the concept of integrating gasification island of alternative fuels with boilers in Siersza Power Plant.

Download

NGK Ceramics Polska Sp. z o.o.

Execution of control of air conditioning systems in the DPF NGK CERAMICS plant building.

Download

RAFAKO S.A.

Consulting services connected to preparation of the application, submitted in the framework of the sectoral Program “INNOCHEM” for co-financing the project: “Development of low-cost way to increase the effectiveness of the flue gas desulphurisation plant.

Download

Górnośląskie Przedsiębiorstwo Wodociągów S.A.

Energy audit of company.

Download

TAURON Wytwarzanie S.A.

Technical consulting in the process of elaborating by AMEC Foster Wheeler Italiana the fesibility study of coal gasification installation, carried out in the framework of Poligeneration Power Plant project.

Download

TRW BRAKING SYSTEMS POLSKA

Energy audit of company department located in Gliwice.

Download

Grupa Azoty Zakłady Azotowe Kędzierzyn S.A.

Comparison the efficiency of securing the supply of oxygen and nitrogen to the Plant in today’s conditions and the potential change of these conditions by investment.

Download

Kopalnia soli “Wieliczka” S.A.

Energy audit of company.

Download

Kelvin Sp. z o.o.

Analysis of conditions of the heat accumulator using in transition states of district heating for Żory Heat Plant.

Download

ZPU PEGRAL Sp. z o.o.

Execution of control of heating system in the ZPU PEGRAL plant building.

Download

RAFAKO S.A.

Consulting services connected to preparation of the application, submitted in the framework of the sectoral Program “PBSE” for co-financing the project: “Flexibility of existing power units with limited investment expenditures“.

Download

ZWiK Sp. z o.o. z siedzibą w Łodzi

Energy audit of production departments.

Download

InnoEnergy KIC

Performed of research work: VALORIZATION – Analysis for coal-fired power plant and PtG (Power-to-Gas) system integration, financed by InnoEnergy.

Download

Kopalnia soli “Wieliczka” S.A.

Analysis of the possibility of application renewable energy sources in the company.

Download

NGK Ceramics Polska Sp. z o.o.

Execution of control of air conditioning systems in the production building of NGK 2 Ceramics plant.

Download

MPEC Włocławek Sp. z o.o.

Elaboration of the feasibility study and financial model for investment of adaptation the existing heat source to requirements of the IED Directive.

Download

TRW Polska Sp. z o.o.

Energy audit of company departments located in Częstochowa.

Download

RAFAKO S.A.

Elaboration of feasibility study for POLYGEN installation as system of conversion waste and biomass to electricity, heat and synthetic natural gas.

Download

PWiK w Elblągu Sp. z o.o.

Energy audit of company.

Download

Tarnowskie Wodociągi Sp. z o.o.

Elaboration of the energy self-sufficiency program of the Plant.

Download

COGNOR S.A. o. Huta Stali Jakościowych

Energy audit of heat management from rotary kiln.

Download

PGE GiEK S.A. o. El Turów

Techno-economic conception (incl. timetable) of the steam generator application for the power plant start-up requirements after critical breakdown of the Polish national power system.

Download

NGK Ceramics Polska Sp. z o.o.

Execution of the energy performance certificate of a building with a cubature of over 500 000 m3 in Gliwice. The scope of work included determining the building energy demand for heating, cooling and domestic hot water.

Download

RAFAKO S.A.

Supporting activities for obtaining the financing for the POLYGEN project from KIC InnoEnergy funds.

Download

NGK Ceramics Polska Sp. z o.o.

Energy audit of boiler plants in DPF NGK Ceramics plant in Gliwice.

Download

Energoinstal S.A.

Elaboration of efficiency correction curves for NGCC power plants in Polkowice and Głogów and support during meetings with representatives of the investor. In the framework of the elaboration were developed correction curves of power unit gross efficiency in the function of water and ambient air parameters.

Download

Cooper Standard Automotive Polska Sp. z o.o.

Execution of control of air conditioning system.

Download

TAURON Wytwarzanie S.A.

Elaboration of feasibility study of the technical concept of cogeneration system and determination the operating parameters of installation.

Download

RAFAKO S.A.

Conceptual design, technical and economic analysis and proposal for financing creation of project under the working title “Municipal polygeneration system fired with biomass and waste”.

Download

InnoEnergy KIC

Participation in consortium carrying out of research and implementation work within the project: CO2-SNG – CO2 methanation system for electricity storage through SNG production, financed by InnoEnergy.

Download

RAFAKO S.A.

Technical and economic analysis of the use of  gas engine fueled by blast furnace gas to produce electricity and heat.

Download

SYNGAZ S.A.

Business plan of the system for utilization of railway sleepers with simultaneous production of electricity and heat.

Download

MPEC Białystok Sp. z o.o.

Conceptual design of air protection systems of K1-K5 boilers in heating plant “Zachód” in Białystok.

Download

RAFAKO S.A.

Business plan of the new R&D entity dedicated to technology of the use of alternative fuels, especially gaseous.

Download

MPEC Włocławek Sp. z o.o.

Technical and economic analysis of adaptation of existing coal fired heating plant, owned by MPEC Włocławek, to IED requirements – first stage.

Download

Energomoc Wzorcownia Sp. z o.o.

Energy audit of an office building.

Download

TAURON Ciepło Sp. z o.o.

Technical and economic analysis of the use of heat accumulator in TAURON’s Heating Plant Katowice.

Download

NGK Ceramics Polska Sp. z o.o.

Energy audit of two production plants.

Download

Gdańskie Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o.

Analysis of the possibility of connecting a new heat source to the existing heating network.

Download

Instytut Chemicznej Przeróbki Węgla

Thermodynamic and construction analysis associated with the development of the design assumptions of the technological system to produce electricity and heat from the combustion of char and by-products from the process gas.

Download

Politechnika Śląska w Gliwicach

„Economical modelling of „capture ready” power plant and „50+” technology”.

Download

Energoprojekt-Katowice S.A.

Training in scope of subcritical pulverised boilers in Thermoflex software in design and off-design modes, in the example of OP-650 boiler.

Download

TAURON Wytwarzanie S.A.

Pre-feasibility study of plant for syntetic natural gas (SNG) production in process of CO2 methanation as a part of workpackage 0 in the CO2-SNG project submited by TAURON to KIC INNOEnergy.

Download

MOEN Mysłowice Sp. z o.o.

Energy inventory of the Benedictine Abbey in Tyniec.

Download

TAURON Wytwarzanie S.A.

The concept and analysis „Installation of the gas turbine and gasifier using biofuels including the combination with K10 and TG6 in TAURON Wytwarzanie SA – Stalowa Wola Department”

Download

Energoprojekt-Katowice S.A.

Training of thermodynamics and Thermoflex.

Download

Remak-Rozruch S.A.

The consultancy service associated with the assessment of the impact of changes in the specified OP-650 boiler.

Download

TAURON Wytwarzanie S.A.

Execution of advisory and analytical assessment of the proposed technology of CO2 breakdown into C and O2.

Download

NGK Ceramics Polska Sp. z o.o.

Energy audit of company.

Download

TAURON Wytwarzanie S.A.

The concept and analysis of combination a gas unit with coal-fired Łagisza Power Plant.

Download

Sandmix Sp. z.o.o.

Thermal inventory of aggregates drying plant.

Download

Remak-Rozruch S.A.

The consultancy service associated with the assessment of the impact of changes in specified OP-150 boiler.

Download

Remak-Rozruch S.A.

The consultancy service associated with numerical modelling (CFD) of specified BB-920 boiler.

Download

Tauron Wytwarzanie S.A.

Analytical and advisory services in the scope of optimization of conception and assessment of coal drying technology offered by MicroCoal Technolgies Inc.

Download