Many companies and institutions we already trusted, many projects are already behind us. Selected opinions presented below.
Energy audit of company.
Participation in consortium carrying out of research and implementation work within the project: POLYGEN – Municipal polygeneration system fired with biomass and waste, financed by InnoEnergy.
Energy audit of company.
Execution of independent expertises for certification of the main auction of the “Capacity Market” for years 2021-2023 for 50 Capacity Market Units.
Execution of calculation-consulting service of energy unit concept with emission level under 550 kg CO2/MWh.
Energy audit of company.
Elaboration of feasibility study of project concerning the reducing emission and the preparation and submission of application in the E-kumulator program financing by NFOŚiGW (National fund for environmental protection and water management).
Energy audit of company with energy efficiency audits of selected upgrades.
Analysis and technical-economic evaluation of the developed solution ensuring heat supply in conditions of the planned development of the municipal heating network in years 2016-2021.
Execution of expertise for generating unit for certification of main auction of the “Power Market” for years 2021-2023.
Summary of consulting, computing and implementation services for NGK Ceramics Polska Sp. z o.o. in the years 2015 – 2018.
Energy audit of company.
Technical-economic concept of gas dehydration installation from methane drainage mines.
Consulting services connected to preparation of the application, submitted in the framework of the sectoral Program “PBSE” for the project: “Installation of ashes vitrification in hybrid boiler furnace”.
Elaboration of the feasibility study and financial model for investment of adaptation the existing heat source to requirements of the IED Directive – second stage.
Consulting services connected to preparation of the application for co-financing the project: “HYBRID system of limiting emission of acidic components and fly ash from flue gas (HYBRID +)”.
Energy audit of company.
Technical-economic evaluation of the expansion of heating network.
Consulting services in the process of performing Pre-FEED evaluation of production system of chemical substances based on gasification of coal with capacity exceeding 400 MW chemical fuel energy.
Elaboration of concept with determination of technical and economic parameters for hybrid power unit.
Energy audit of company.
Elaboration of the concept of integrating gasification island of alternative fuels with boilers in Siersza Power Plant.
Execution of control of air conditioning systems in the DPF NGK CERAMICS plant building.
Consulting services connected to preparation of the application, submitted in the framework of the sectoral Program “INNOCHEM” for co-financing the project: “Development of low-cost way to increase the effectiveness of the flue gas desulphurisation plant.“
Energy audit of company.
Technical consulting in the process of elaborating by AMEC Foster Wheeler Italiana the fesibility study of coal gasification installation, carried out in the framework of Poligeneration Power Plant project.
Energy audit of company department located in Gliwice.
Comparison the efficiency of securing the supply of oxygen and nitrogen to the Plant in today’s conditions and the potential change of these conditions by investment.
Energy audit of company.
Analysis of conditions of the heat accumulator using in transition states of district heating for Żory Heat Plant.
Execution of control of heating system in the ZPU PEGRAL plant building.
Consulting services connected to preparation of the application, submitted in the framework of the sectoral Program “PBSE” for co-financing the project: “Flexibility of existing power units with limited investment expenditures“.
Energy audit of production departments.
Performed of research work: VALORIZATION – Analysis for coal-fired power plant and PtG (Power-to-Gas) system integration, financed by InnoEnergy.
Analysis of the possibility of application renewable energy sources in the company.
Execution of control of air conditioning systems in the production building of NGK 2 Ceramics plant.
Elaboration of the feasibility study and financial model for investment of adaptation the existing heat source to requirements of the IED Directive.
Energy audit of company departments located in Częstochowa.
Elaboration of feasibility study for POLYGEN installation as system of conversion waste and biomass to electricity, heat and synthetic natural gas.
Energy audit of company.
Elaboration of the energy self-sufficiency program of the Plant.
Energy audit of heat management from rotary kiln.
Techno-economic conception (incl. timetable) of the steam generator application for the power plant start-up requirements after critical breakdown of the Polish national power system.
Execution of the energy performance certificate of a building with a cubature of over 500 000 m3 in Gliwice. The scope of work included determining the building energy demand for heating, cooling and domestic hot water.
Supporting activities for obtaining the financing for the POLYGEN project from KIC InnoEnergy funds.
Energy audit of boiler plants in DPF NGK Ceramics plant in Gliwice.
Elaboration of efficiency correction curves for NGCC power plants in Polkowice and Głogów and support during meetings with representatives of the investor. In the framework of the elaboration were developed correction curves of power unit gross efficiency in the function of water and ambient air parameters.
Execution of control of air conditioning system.
Elaboration of feasibility study of the technical concept of cogeneration system and determination the operating parameters of installation.
Conceptual design, technical and economic analysis and proposal for financing creation of project under the working title “Municipal polygeneration system fired with biomass and waste”.
Participation in consortium carrying out of research and implementation work within the project: CO2-SNG – CO2 methanation system for electricity storage through SNG production, financed by InnoEnergy.
Technical and economic analysis of the use of gas engine fueled by blast furnace gas to produce electricity and heat.
Business plan of the system for utilization of railway sleepers with simultaneous production of electricity and heat.
Conceptual design of air protection systems of K1-K5 boilers in heating plant “Zachód” in Białystok.
Business plan of the new R&D entity dedicated to technology of the use of alternative fuels, especially gaseous.
Technical and economic analysis of adaptation of existing coal fired heating plant, owned by MPEC Włocławek, to IED requirements – first stage.
Energy audit of an office building.
Technical and economic analysis of the use of heat accumulator in TAURON’s Heating Plant Katowice.
Energy audit of two production plants.
Analysis of the possibility of connecting a new heat source to the existing heating network.
Thermodynamic and construction analysis associated with the development of the design assumptions of the technological system to produce electricity and heat from the combustion of char and by-products from the process gas.
„Economical modelling of „capture ready” power plant and „50+” technology”.
Training in scope of subcritical pulverised boilers in Thermoflex software in design and off-design modes, in the example of OP-650 boiler.
Pre-feasibility study of plant for syntetic natural gas (SNG) production in process of CO2 methanation as a part of workpackage 0 in the CO2-SNG project submited by TAURON to KIC INNOEnergy.
Energy inventory of the Benedictine Abbey in Tyniec.
The concept and analysis „Installation of the gas turbine and gasifier using biofuels including the combination with K10 and TG6 in TAURON Wytwarzanie SA – Stalowa Wola Department”
Training of thermodynamics and Thermoflex.
The consultancy service associated with the assessment of the impact of changes in the specified OP-650 boiler.
Execution of advisory and analytical assessment of the proposed technology of CO2 breakdown into C and O2.
Energy audit of company.
The concept and analysis of combination a gas unit with coal-fired Łagisza Power Plant.
Thermal inventory of aggregates drying plant.
The consultancy service associated with the assessment of the impact of changes in specified OP-150 boiler.
The consultancy service associated with numerical modelling (CFD) of specified BB-920 boiler.
Analytical and advisory services in the scope of optimization of conception and assessment of coal drying technology offered by MicroCoal Technolgies Inc.